HUBBLE MIDDLE SCHOOL

Location: Warrenville, Illinois

Budget / Size: $40M / 186,600 SF

LEED Status: LEED-Schools v2007 Gold

Services: Overall LEED project management; preparation and implementation of management plans for LEED design and construction integration; teaming charrettes; energy modeling; fundamental and enhanced commissioning coordination; documentation, coordination and submission of LEED certification package and LEED certification process management with USGBC

Schedule Start: August 2007
Schedule Completion: September 2009

Client Contact: Vuk Vujovic, Legat Architects, 312.756.1266
Vertegy Contact: Grant Lanham, Principal, 314.399.9991

Description: Hubble Middle School, the first LEED for Schools project for Vertegy, serves the Warrenville and Wheaton areas of Illinois, just outside of Chicago. The project was funded through a bond issue, and the team worked diligently with the school board to build the LEED requirements into the referendum. The team's goal of certifying this project under LEED for Schools at a Silver level was exceeded, and the team achieved Gold in May of 2010. Specific sustainable features include highly reflective roofing materials in addition to a small green roof, use of native and adapted plantings to eliminate the need for irrigation, more than 35% reduction in potable water use, diversion of more than 82% of construction and demolition waste from landfill (more than 960 tons total) and inclusion of low-emitting adhesives, sealants, paints, coatings, carpet systems and composite woods.


Other Awards:

  • 2010 Award of Merit, Illinois Association of School Boards
  • 2010 Middle School Citation, American School & University Magazine
  • 2010 K-12 Project of the Year, Midwest Construction Magazine